Fort Vining Fence Construction

Photos from the font fence construction phase

 
 
 
11.09.01: main support column
  front driveway entrance
     
 
11.16.01: the completed towers
 
 
 
 
 
 
 
 
 
 
11.14.01: nine feet worth of limestone
   
the footings go six feet deep    
     
 
12.04.01: they have hats now   12.04.01: nice day to be a column
     
 
12.19.01: the driveway is demolished    
     
12.19.01: electro-magnetic sensors are installed just before the new concrete is poured
 
12.20.01: the new driveway
 
01.10.02: the gate goes up. angled hinges cause the base to rise 9 inches as so clear the graded drive
 
01.10.02: welding the post to the column
 
 
 
01.15.02: the west radius
  east radius
 
     
01.15.02: there is a 2 foot 3 inch elevation drop on the west radius
 
the drop in elevation eliminates the need for 'stepping' and allows the lower picket line to remain level
     
01.24.02    
the "doorking vehicular swing gate operator" with variable speed wormgear is installed
  call box: patches into phone system (it can even transfer a call to my cell phone so i can open the gate)
 
     
now this... i really like!   beware of dog
 
     
 
04:09.02: this shows up in the front yard
 
 
 
 
 
 
 
 
 